A major upgrade in stadium visibility
The project began with the removal of the existing LED and aluminium advertising panels, completed in just four days. The new installation followed in July, with MaxAmaze and OMM completing the main installation works within two weeks.
The system consists of 324 LED panels, delivering approximately 397.5 m² of LED surface with a P10 pixel pitch. With a height of 96 cm, the new LED boarding integrates into the existing stadium architecture while providing a powerful platform for dynamic advertising and matchday content.