From Planning
to Operation
The process began with detailed on-site measurements, followed by ordering, logistics, and transport to Bulgaria. Once on location, the MaxAmaze team coordinated the installation of the LED boarding system. After setup, the system was thoroughly tested, and on-site training was provided to ensure seamless operation from the very first match.
