Preparation
& Collaboration
Every MaxAmaze delivery begins long before arriving on site. This installation was preceded by several weeks of technical preparation, including client meetings, tailored cabling solutions, structural design, and equipment coordination.
The mounting structure was developed in collaboration with AFAB Engineering, a trusted partner of the club. Their local expertise played a key role in ensuring a seamless build and smooth integration with the existing stadium layout.
