Engineering the Smartest Solution
Every stadium has its own technical challenges, which is why every solution starts with engineering.
Rather than replacing the complete floodlighting installation, MaxAmaze first carried out a detailed site survey and digital lighting study. The existing floodlights were measured and simulated to determine exactly which fixtures needed to be replaced to comply with UEFA lighting standards.
Based on this analysis, only the outdated fixtures that were technically required were replaced. A total of 26 new MaxAmaze LED floodlights were installed on the existing lighting masts and the roof of the main stand, while the remaining infrastructure stayed fully operational. This targeted approach significantly reduced the investment without compromising performance.