Project Scope & Timeline
After initial coordination from Belgium and on-site visits at the end of October, our installation team worked in Riyadh from 17 to 29 November. During this period, MaxAmaze dismantled the existing lighting systems—120 outdoor fixtures and 45 indoor fixtures—and prepared the infrastructure for an entirely new setup.