International Logistics Under Pressure
One of the defining challenges of this project was the international nature of the operation. All technical equipment was transported by air freight between Europe and the United States, a process that requires precise coordination, especially within tight event schedules and evolving import-export regulations.
In total, 16.7 tonnes of LED equipment were flown in, installed, and prepared for live operation within a matter of days. The ability to manage this process efficiently highlights the importance of planning, adaptability and strong logistical execution.